Böker Magnum Long Lead EDC 01SC080 gentleman's knife
Böker Magnum Long Lead EDC 01SC080 gentleman's knife
Order before 5:30 PM & get same day shipping
Add engraving?
Full description
The Böker Magnum Long Lead EDC 01SC080 is a fancy and slim gentleman's knife. The Long Lead EDC is enhanced with an 8Cr13MoV steel blade with a slipjoint lock. A slipjoint won't completely block the blade. As such you can legally carry it with you almost anywhere. 8Cr13MoV is a decent type of steel you can easily sharpen yourself. Great for daily use. You open the knife with two hands with the help of the nailnick.
Specifications
8 cm
78 g
Material handle
G10
Type of steel
8Cr13MoV
Also popular
Reviews
Wednesday 21 August 2024
Thursday 1 December 2022
Wednesday 21 September 2022
Specifications
Dimensions & weight
8 cm
2.7 mm
Closed length
10.4 cm
Total length
18.4 cm
78 g
Material
Material handle
G10
Type of steel
8Cr13MoV
57 HRC
Features & functions
Finish blade
satin
Right or left-handed
symmetrical
Blade shape
drop point
plain edge
No
Tools
knife
Opening system
nail nick
Type
everyday carry, gentleman’s knife
Pocket clip
yes, tip-down (right)
Pocket clip position
tip-down
Pocket clip side
right
slipjoint
Can be opened with one hand
No
flat, Secondary V-edge
Number of tools
1
Scope of delivery
Pouch
No
Sheath
No
Recommended combi-deals
Böker Magnum Long Lead EDC 01SC080 gentleman's knife
Order before 5:30 PM & get same day shipping
Add engraving?